Apartment Refurbishment - Fylde Coast
A full refurbishment of a two bedroom apartment which had décor dating back to the early 1960's.
As the apartment was on the 3rd floor of the building, logistics for materials was a little bit of a challenge during the building programme - over all 10wks
The schedule of works for the refurbishment involved:
-
Full soft strip out
-
Complete joinery package
-
New plastered finishes to walls and ceilings
-
New contemporasy kitchen and bathroom
-
New wall tiling
-
Redesigned living space with media wall
-
Complete new central heating system
-
LED lighting scheme
-
Electrics
-
Decorationd and paper hanging
-
Floor finishes - hard and soft
-
Redesigned balcony space - somewhere to chill
-
Upgrade on loft insulation - 200mm thick to bring up to new regs
-